.. _entities-scheduled-changes:

Scheduled Changes
=================
ZoneControl stores changes that need to happen at a certain time as a
Scheduled Change.

A scheduled change as shown in the interface can be seen in
:numref:`figure-admin-scheduled-change-finished`.

.. _figure-admin-scheduled-change-finished:

.. figure:: ../img/admin-scheduled-changes-finished.png
    :width: 100%
    :align: center
    :alt: Finished scheduled change in the admin panel
    :figclass: align-center

    Finished scheduled change in the admin interface

When a staff-user is allowed by any of its roles to access the Scheduled Change
and the change has not occured yet, these fields can be edited in the administrative
interface:

* Zone
* RR name
* Type
* TTL
* RR records
* API server
* Scheduled at
